Skip to content

yandex market

large-scale marketplace with 18M+ active buyers and 60K+ daily sellers

Yandex Market seller orders redesign: orders list, order card, 60k+ DAU in orders section, +35% faster order preparation, 10 → 10k orders in the same workflow

sellers lost the first hours of every morning digging through dozens of open order tabs across scattered sections

goal

match the seller's real workflow, make order flow transparent, lift satisfaction, and cut storage costs at Market warehouses

solution

orders grouped by status and work priority, processed in bulk or in a split-screen card, with logistics tracked inline

DAU
60K+
faster order prep
+35%
same workflow for orders
10 → 10k
Redesigned orders section: orders list with bulk selection and the ActionBar, order card open in a split screen

discovery

I interviewed sellers, watched them work orders at their warehouses, and mined prior research and support tickets.

Customer journey map with seller quotes: starting the day, sorting and preparing, monitoring, end of workflow

tab by tab, every morning. Sellers spent 2 to 3 hours each morning on 50 to 150 orders, each opened in its own browser tab.

the flow kept breaking. Shipments lived in a separate section most sellers barely understood, and with no bulk action they jumped out mid-task to prep dispatch.

built the CJM from "what did you do today". Asking what they did today pulled out the real workflow instead of a tidy story. I also watched sellers on Ozon and Wildberries for free competitive research.

CJM board: order processing stages with seller pains and ideasSupport tickets clustered by stage: order processing, shipment forming, handoff to courier, sort center

align to the work

from status board to a day's work. Group orders by lifecycle priority so sellers move by action instead of hunting across system states.

bulk and visible logistics. Process many at once, and always see where each order is and how many sit in each status.

match the real process. The design follows the seller's physical workflow from the CJM instead of the system's internal model.

Orders grouped by lifecycle priority, following the seller’s physical workflow

designing it object-first

mapped it object-first. Job stories → user flow → an object map of orders, boxes, labels, shipments, and acts → a prototype on the board with the team.

Job stories for FBS and Express sellersObject map of orders, boxes, labels, shipments and acts

replaced new tabs with a split-screen. I put the order in a card on the right, so you view and process it there. Done orders drop to a table you just track.

bulk actions on selection. Checking orders brings up an ActionBar pinned to the bottom, so sellers confirm readiness and prep shipment for many at once.

Orders list with three orders selected and the bulk ActionBar: ready to ship, order list, labels

untangled shipments. The part nobody understood. I gave it a clear view: orders grouped for the day's dispatch, the acceptance act generated in one place, and handoff to the sort center confirmed inline.

Shipments view: orders grouped for the day’s dispatch with the acceptance certificate generated in one place

the order without leaving the screen. Instead of a separate page in a new tab, an order opens in a split-screen card or a drawer, so sellers keep their place and the scenario never breaks. Status stays transparent end to end.

Order opened in a drawer with delivery status from ready to pack to in transit

validated on a prototype first. I ran moderated tests with real sellers, the new flow against the old, before committing to design.

Usability test notes on sticky notes
Moderated test script: goal, what we check, warm-up questions, taskClickable prototype flow used in the moderated tests

shipped on design system. I built new components into Levitan (the bulk-action ActionBar and the orderCard) and reused the rest, then QA-reviewed layout and logic on staging with devs.

Levitan design system: orderCard component anatomyorderCard variations: with and without checkboxLevitan design system: Action Bar component anatomyAction Bar variations

scope & constraints

the box I had to fit. Top-3 section by traffic meant I couldn't disrupt daily work. Shipments auto-generated by delivery date, so I designed around that rule.

split-screen over patching the legacy table. I convinced the team to rebuild with a split-screen instead of patching the legacy table; backend wanted the legacy gone, frontend wanted it done right. It cut processing time and clicks, ended the dozens of tabs sellers juggled early on, and gave one seamless orders dashboard.

the table stays, the order opens in a drawer. Orders that need no processing (in transit, delivered, the full list) stay a table. Opening one slides out a drawer instead of a new page, with status end to end, so sellers never leave the section or spawn tabs.

result

for the seller. Process in 3 clicks or in bulk, in one section, with logistics inline. The morning tab-juggling is gone.

the business won too. Faster, more reliable processing meant fewer delays and lower storage pressure at Market warehouses.

DAU
60K+
faster order prep
+35%
same workflow for orders
10 → 10k

scale & system

scales with volume. The status model works the same for a seller with 10 orders or thousands a day.

reusable across the dashboard. The ActionBar and orderCard I built went into Levitan, so other teams reuse them instead of rebuilding.

reflection

I chose a clean rebuild over safe iteration. The old section was organized around the system's statuses; sellers think in the order of their day. I rebuilt it around their workflow instead of the database's state model.

In high-volume B2B, the interface should mirror the user's real process rather than the system's internal structure. Align to the work, and the screens almost design themselves.

open to new product challenges where design has real impact on systems, users, and business